Throwback to the remarkable initiative by the Humber Safety Boats crew, undertaking a river bank repair to preserve the integrity of our waterways.
Last summer Humber Safety Boats were contracted by Jackson Civil Engineering to facilitate the repair to sections of the Stallingborough Drain, where access with a machine was hindered due to overhead pipelines.
Despite this the crew were able to safely and efficiently conduct the repair to four separate sections of the drain. Introducing structural support to the back and increasing the overall integrity.
The crew are looking forward to the second phase of this operation, allowing us to play a vital role in conserving our waterways and environment.
コメント